4.0 km
Total Distance
14 m
Elevation Gain

Trail description

The signature 4 km stretch of the former railway line between Hillview and the conserved Bukit Timah Railway Station, reopened by NParks and URA in 2021. It passes the two conserved truss bridges, the steel girder bridge at Hindhede and the Singapore Quarry Bridge.

Route Map

Difficulty

1/5 · Very Easy